
This is another situation that
requires the overhead crane to rest for a while upon reaching both of the rail.
After a pre-determine time the overhead crane will re-start in the opposite
direction.
The control circuit of this system
is shown in Figure 8. Two times TR1 and TR2 are connected to the limit switches
Y and X respectively at terminal 3.
The
terminal no. 1 of the instantaneous contacts TR1(1-3) and TR2(1-3) are
connected to the...